两全其美网校城

 找回密码
 注册

2011年英语六级考试冲刺练习阅读篇五十五

2011-11-22 21:48| 发布者: 叶儿| 查看: 201| 评论: 0

摘要:   In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System buil ...

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of

  standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

 

类别
班级名称
主讲人
课时
价格
试听
报名
学习交流
CET-4
61
200
 

英语四级论坛

词汇专项班

23

100

 

听力专项班

8

60

 
10
80
 
10
80
 
10
80
 
12
100
 
CET-6
23
200
 

新学员:报一科、两科9折优惠,报三科及三科以上8折优惠

老学员:报一科、两科8折优惠,报三科及三科以上7折优惠


鲜花

握手

雷人

鸡蛋

路过

最新评论

     
Baidu
中华会计网校 新东方网络课堂 中华会计网校会计继续教育 新东方网校 环球网校 中公网校

小黑屋|手机版|关于我们|两全其美网校城 ( 京ICP备05068258-34 )

GMT+8, 2024-5-4 11:42

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

返回顶部